Hexagonal LED Lantern

Open-top six-sided lantern with eighteen diamond windows, integral corner lap tabs and a supported hexagonal floor. LED ONLY; no candles.

Materials

  • 200-240 gsm cardstock
  • Craft knife and cutting mat
  • Metal ruler and blunt scoring tool
  • PVA glue
  • Small clips
  • Battery LED tealight, maximum 40 mm diameter x 45 mm high

Finished size: 100 x 86.60254 x 120 mm; regular hexagon side 50 mm

Steps

CutValley foldMountain foldGlue area

  1. Calibrate and cut the six pierced walls

    Print at 100 percent. Measure the 50 mm ruler and a 50 x 120 mm body. Cut the three enclosed diamonds in each wall on a mat, then cut the outer perimeters without removing either tab. Score only the two marked hinges. Keep the 6 mm bridges intact; do not cut the fold lines.

  2. Pre-fold and identify the laps

    Keep printed sides outside. Fold every right seam tab away from the printed face by 60 degrees from flat (120-degree internal corner). Fold each lower tab away from the print by 90 degrees toward the lantern interior. The 8 mm seam tab belongs beneath the next wall, never over a diamond.

  3. Join the first three faces

    Apply a thin film of glue to the printed face of P1 right tab. Align P2 left edge exactly with P1 seam hinge; bottom and top body edges must be level. Press the first 8 mm of P2 onto the tab. Repeat P2 to P3. Keep 120-degree inside corners; clip the solid rails and allow the joins to set.

  4. Close the six-sided shell

    Repeat P3 to P4, P4 to P5 and P5 to P6 with 8 mm laps. Close P6 tab under P1 left edge last, pressing through the open top. On a level surface, measure 50 mm between neighboring vertical hinges, 100 mm between opposite corners and 86.60 mm between opposite walls. Adjust before glue sets; all six lower tabs point inward at the same level. Let seams dry.

  5. Fit and glue the hexagonal floor

    Cut B1 and verify all six edges are 50 mm. Lower it through the open top with its unprinted face down; rotate so every edge meets one wall bottom, not a corner. Dry-fit on the six 8 mm support tabs. Remove B1, put glue on the upward/reverse face of each lower tab (opposite its printed GLUE mark), and replace B1. Press its six edge zones down against the tabs on a flat table. Keep the floor level; allow PVA to dry fully.

  6. Insert and service the LED through the top

    Confirm the floor is bonded at all six supports and the shell stands level. Switch on a battery LED tealight no larger than 40 mm diameter x 45 mm high and lower it through the 86.60 mm across-flats top opening onto the center of B1. Leave the top open; lift the LED out to switch it off or replace batteries. LED ONLY - no candles or flame. Actual assembly testing remains pending.

Notes

The 3D model shows each piece in its finished, idealized shape; the exploded view only spreads the pieces apart. It is not a paper-physics simulation: curved shapes are forming guides, not exact physical folding or proof of developability, and intermediate fold shapes are not supplied.